Your one-stop resource for interconnection applications and technical requirements to guide planning and installation of renewable energy systems.
Interconnection resources

Level 1 interconnection application
Application for systems generating 25kW or less.

Level 2 interconnection application
Application for systems generating between 25kW and 2MW.

Level 3 interconnection application
Application for systems generating more than 2MW.

Technical requirements
Rules for interconnection and parallel pperation of distributed generation.

Screening process
Learn how AES Ohio evaluates interconnection applications.

Timeframe and fees
Interconnection rules are defined in AES Ohio's tariff approved by the Public Utilities Commission of Ohio.