AES Ohio is proposing a new single circuit 69 kV line connecting the Botkins Substation in Botkins and the St. Marys Substation in St. Marys to the Village of New Knoxville. This new 69 kV transmission line will connect through a three-way tap to support the Village of New Knoxville. These enhancements introduce additional capacity and redundancy into the Village of New Knoxville and surrounding area. Additionally, these facilities will support operational flexibility for preventative maintenance on other transmission lines and transmission substation equipment within the region.
Why is this project needed?
AES Ohio is dedicated to accommodating the load growth near the Village of New Knoxville, Ohio. The latest load requests necessitate an increase in transmission support by 2030. These network enhancements are designed to serve the new load and provide increased capacity, flexibility, and redundancy for Auglaize and Shelby counties and their communities.
Additional project information
New Knoxville area improvement project timeline